Saint John’s WWTP is another one-person operation (Paul Stock). In November of 2004, the plant concluded an extensive renovation which transitioned the former Class C Plant to a Class B Plant. Because expansion involved a modification to our permit, the Minnesota Pollution Control Agency imposed an anticipated limit on the amount of phosphates allowable in our discharge. The renovated and expanded plant exercises both biological and chemical processes to reduce and meet the lower phosphate limits. We designed the renovation so as to discharge only a third of allowed phosphate levels.
Being a privately owned plant, we have more control in addressing problems that arise in the plant,such as getting storm and sanitary sewers separated during construction or renovation activities, or in tracking down the source of undesirable chemicals which may be entering into the processing system from the science buildings, the Power Plant, or the art department.
The WWTP experiences slower flow when students leave for breaks, allowing opportunities for maintenance and repairs at the plant.
The WWTP has been generally well maintained in the past.
Copyright © 2009 College of Saint Benedict (37 South College Avenue, St. Joseph, Minnesota 56374; 320-363-5011) and
Saint John's University (P.O. Box 2000, Collegeville, Minnesota 56321; 320-363-2011). All rights reserved.
Affirmative Action/Equal Opportunity Employers. E-mail the CSB/SJU Web Coordinator.